SEMI-ANNUAL REPORTING FOR CONTINUOUS MONITORING SYSTEMS AND STACK TESTING
MWC
UNIT #
POLLUTANT
OR
PARAMETER
START
DATE
mm/dd/yyyy
START FINISH MONITORED
LEVEL
APPLICABLE
LIMIT
SPECIFIC REASON
FOR EXCESS
CORRECTIVE
ACTIONS TAKEN
                 
1 CO 9/2/2003 08:00 11:59 112 69 Shutdown for planned maintenance. Average based on only 1 hour of operation. Followed normal shutdown procedure using gas burners
1 CO 11/20/2003 04:00 07:59 1174 69 Malfunction - primary air fan vibration Reduced air flows and steam load to maintain safe operation of combustor
1 CO 11/20/2003 08:00 11:59 3347 69 Emergency shutdown due to fan bearing failure. Average based on only 1 hour of operation. Followed shutdown procedure to repair primary air fan vibration.
1 CO 12/15/2003 08:00 11:59 136 69 Shutdown for planned maintenance. Average based on only 1 hour operation. Followed normal shutdown procedure using gas burners
2 CO 7/14/2003 08:00 11:59 265 69 Shutdown for tube leak. Average based on only 1 hour of operation. Followed normal shutdown procedure using gas burners
2 CO 10/12/2003 08:00 11:59 78 69 Shutdown for tube leak. Average based on only 2 hours of operation. Followed emergency shutdown procedures
2 CO 10/27/2003 08:00 11:59 410 69 Shutdown for planned maintenance. Average based on only 1 hour of operation. Followed normal shutdown procedure using gas burners